PJSC "Yakovlev" has opened a vacancy for a project manager to coordinate the SJ-100 program. The announcement was posted on one of the job search resources.
The company has put forward the following requirements for candidates - higher technical education, experience of 5 years in similar positions in the aviation industry and the ability to use the basic certification standards.
The specialist will have to control the bench certification tests and qualification work of subcontractors under the SJ-100 program. The salary was not announced at Yakovlev.
The Superjet has not yet been officially certified in Russia. The Ministry of Industry and Trade emphasized that the SJ-100 does not depend on foreign components and is assembled entirely at domestic facilities.
Read more on the topic:
Now on home
The new line ensures the production of up to 10,000 high-quality electric motors per month
The vessel of project GM 3.02 was laid down back in 2020
Military Analyst Shlepchenko: Mesh Modem Efficiency Lower on the Ground Than in the Air
Revenues of the Beriev Aviation Plant decreased by 3.8 times in 2025
Il-86VzPU managed to capture during refueling
Extreme flight to Belukha for hockey on a frozen reservoir raised questions about compliance with aviation regulations
The main task of the specialists is to establish stable operation of engines in severe cold
The project, launched in 2021, will be completed in 2027, increasing capacity by 15 MW
Vladimir Popov: "Checkmate will definitely be better than the F-35"
New design reduces the weight of the traction module without loss of power
Haval F7x and Haval F9 experience operational difficulties
The project is being implemented by Belarusian MAZ and the Russian company "Itelma"
Articles
-
TNI: Russia Claims Project 22350 Frigate Can Sink US Navy Aircraft Carrier
10 Feb 2026
-
Sarma MLRS hits targets with surgical precision - military expert Korotchenko
09 Feb 2026
-
Russian An-124 "Ruslan" Stuck in Canada for 4 Years and Accrues Millions in Fines
26 Jan 2026
-
Coaxial Propellers: How Counter-Rotation Increases Turboprop Engine Efficiency
25 Jan 2026