Researchers from NUST MISIS have developed a mathematical model that can improve the energy efficiency of mining enterprises by 20%. The development is aimed at accurately assessing the operation of industrial equipment and reducing unjustified energy costs.
The new methodology is based on an econometric model of stochastic frontier analysis. Unlike existing expert assessments, the algorithm analyzes accurate data on the operation of equipment, identifying parameters at which the equipment consumes more energy than necessary.
What the new model does (stochastic analysis):
- Collects accurate data: It connects a "smart meter" to each "device" — recording thousands of parameters of equipment operation in different modes (loaded/empty, uphill/downhill, etc.).
- Builds an ideal standard: The algorithm calculates how much energy a machine should ideally consume to perform a specific job.
- Finds discrepancies: Then the program compares the ideal indicator with the actual consumption and accurately determines the difference — those same "hidden losses" of 4.5-20.7%.
- Separates random from systematic: An important point — the model "understands" which losses are caused by random factors (for example, bad weather), and which are a systemic problem (wear of parts, suboptimal settings, operator errors) that can and should be corrected.
The technology translates the energy consumption of an enterprise from the mode of "guesses and approximate estimates" to the mode of accurate digital diagnostics. It shows the management not just the fact of overspending, but its exact size and, most importantly, the source of the problem that needs to be eliminated.
The model was tested on data collected in 2021–2023 at one of the coal mines in Siberia. The study analyzed almost five thousand work shifts. Calculations showed that previously unaccounted energy losses during the operation of heavy equipment, such as excavators and dump trucks, range from 4.5% to 20.7%.
According to scientists, these losses are equivalent to millions of kilowatt-hours and tens of millions of rubles annually for one enterprise. As the developers explained, the methodology is applicable not only in the mining industry, but also for other types of technological production, which can contribute to increasing their profitability and sustainable development.
Read more materials on the topic:
Новый цех по производству минерального порошка открылся в Амурской области
Одобрен проект разработки Нивагальского месторождения нефти и газа
Переход на отечественное ПО вызвал масштабные сбои в работе портала государственных актов
Now on home
Start of deliveries scheduled for 2027
Over 51,000 new motorcycles were sold in Russia in 2025
The car will take at least a year to assemble
The application's audience has reached 20 million users
The model will be included in the list of cars for taxis, price - from 2.25 million rubles
All parking lots of the "Administrator of the Moscow Parking Space" are connected to the service
The cars will be supplied to the Moscow Transport Service Directorate
Deliveries to India may begin in 2028
The technology provides automated search for all types of defects in power units
The plane flew 500 km, accelerating to 425 km/h
The plant stated that the information about the termination of purchases for models 6 and 8 is not true
Scientists are using the "Ekran-M" installation