"ODK-Perm Motors" (part of UEC) is significantly increasing the throughput of workshops for the production of aircraft engines, the corporation's press service reported.
In the welding shop of "ODK-Perm Motors", the equipment load will be increased by 50%, the time for preparatory and final operations will be reduced by 80%, and the tooling for parts will be created 25% faster.
Also, in the assembly shop, the equipment setup time will be reduced and universal tooling will be introduced, as a result of which the parts manufacturing time will be reduced by 15%.
"ODK-Perm Motors" is the main manufacturer of the fifth-generation PD-14 series domestic aircraft engine for MC-21-310 medium-range aircraft.
Earlier www1.ru reported that a video of the testing of the new PD-35 aircraft engine has appeared, but there is no aircraft for it yet.
Read more materials:
A millionth titanium ingot for the construction of MC-21 and SJ-100 was smelted in Russia