Rosaviatsiya Commission Conducts Inspection at the Manufacturer of PD-14 and PS-90A Aircraft Engines

Head of the agency Dmitry Yadrov inspected the operation of the assembly shop of "ODK-Perm Motors"

The head of Rosaviatsiya, Dmitry Yadrov, visited the aircraft engine assembly shop at the "ODK – Perm Motors" enterprise, the agency's press service reports.

Head of the agency Dmitry Yadrov inspected the operation of the assembly shop of "ODK-Perm Motors"
Head of the agency Dmitry Yadrov inspected the operation of the assembly shop of "ODK-Perm Motors"

The enterprise produces PD-14 aircraft engines for MS-21-310 aircraft and PS-90A engines for Tu-214 and Il-96. Yadrov got acquainted in detail with the work of each of the assembly shop sections where serial PD-14s are produced.

The current status of the PD-14 serial production program for MS-21 medium-range aircraft was reported by Alexander Inozemtsev, General Designer of "ODK-Aviadvigatel".

Head of the agency Dmitry Yadrov inspected the operation of the assembly shop of "ODK-Perm Motors"
Head of the agency Dmitry Yadrov inspected the operation of the assembly shop of "ODK-Perm Motors"

In March 2025, the Permian manufacturing organization successfully passed a periodic inspection by Rosaviatsiya and confirmed compliance with the requirements of aviation regulations.

Earlier, www1.ru reported that Rostec is ready to start deliveries of MS-21, SJ-100 and Il-114-300 abroad.

Read more materials:

"Russian Helicopters" of Rostec suffered a loss of 2.5 billion rubles in six months of 2025

Tu-214 "will not take off" due to PS-90A and weight: the chief designer of Tu-204 delivered the verdict

The fully Russian MS-21-310 has flown only 70 hours: certification is proceeding in small steps

Now on home