St. Petersburg-based "Metalworking Technology Center" has filed a lawsuit against the Ural Civil Aviation Plant (UZGA) to recover a debt of approximately 404 million rubles.
The materials were submitted to the Arbitration Court of the Sverdlovsk Region in mid-August and have not yet been accepted for production.
The essence of the case has also not been disclosed. It is likely that the issue concerns the recovery of debt for components supplied for aircraft manufactured by UZGA.
UZGA is the manufacturer of the new regional aviation aircraft LMS-901 "Baikal". Before the start of mass production, the plant had already built the fourth prototype of the "Baikal", designed to replace the Soviet " кукурузник "— An-2.
Earlier, www1.ru reported that Rostec is ready to start supplying MC-21, SJ-100 and Il-114-300 abroad.
Read more materials:
The wing of the SJ-100 deformed within the normal range: Yakovlev tested the liner
The first combat regiment with Su-57 fighters appeared in the Russian Aerospace Forces
Now on home
Герой России Гарнаев: никто из профессионалов о возобновлении производства на КАЗ всерьёз не говорит
Система отслеживает спутники на высотах до 50 000 км и ведёт за ними наблюдение
The armored vehicle is equipped with a KamAZ-740.35-400 diesel engine with a power of 400 hp.
Constant improvements in avionics, weapons and tactical capabilities will make the aircraft a flexible response to future challenges
The exterior of the KamAZ-54901 features fairings on the cab and chassis for fuel economy
Fighters are in demand both domestically and abroad
Tyazhpromexport and Venezuela Agree on Plant Revival
The company not only completed the state order, but also quickly mastered the production of AK-12K for special forces
Experts have developed a photogrammetric complex with a resolution of less than 1 cm