The power plant for the aircraft was developed at the Ural Civil Aviation Plant
UZGA promises to pay a radio equipment installer up to 75 thousand rubles
Hundreds of aircraft will be decommissioned by 2030 — and the replacement is lagging behind
Senator Muratov called for support for UZGA in the development of the aircraft
The department promised to get the An-2 replacement into the air before the end of 2025
UZGA Called for Accelerating the Decision on Preferential Financing for Aircraft Deliveries
UZGA Announces Certification Timeline and Key Characteristics of the Aircraft FAQ w
Aviation expert Patrakov stated back in 2022 that it was impossible to implement the plans in the CPGA
The truth in comparing Soviet and Russian light aircraft lies in the middle
Honored Pilot Smirnov stated that the project could be "buried" within the UAC
Samara Metallurgical Plant went to court against UAC and its enterprises
NKN Company has released software for designing a digital model of a composite package structure
Replacing the 70-year-old An-2 has not yet been possible
UAC Coordinates Creation of 3–5 Models with a Capacity of 5–9 Passengers by 2028
Almost all aviation equipment is produced domestically