The largest enterprise in the Zaporozhye region for the production of hydraulic equipment, MDK-Hydrosila LLC, and the Saratovdizelapparat plant have announced the start of a joint project to develop a cab tilting system for Kamaz trucks. This was announced by Svetlana Agafonova, General Director of MDK-Hydrosila, at the Innoprom-2025 exhibition in Yekaterinburg.
As part of the project, Saratovdizelapparat will be engaged in the production of a hand pump, and MDK-Hydrosila will develop and manufacture a cab tilting hydraulic cylinder. Our joint work will allow us to provide Kamaz and other enterprises in the industry with high-quality domestic components. This is an important step towards strengthening technological independence and developing new competencies.
As part of the joint project, the companies also plan to improve the characteristics of hydraulic systems for dump trucks and optimize transmission units for agricultural and road construction equipment.
The MDK Group of Companies is one of the largest manufacturers of hydraulic equipment and spare parts for agricultural machinery. Saratovdizelapparat specializes in the production of components for dump trucks and construction equipment.
Earlier, www1.ru reported that mass production of engines for automotive equipment will be налалят in the Moscow region.
Read materials on the topic:
Three new auto component factories will open in Togliatti
A new factory for the production of parts for Lada will be built in Togliatti
A new auto component factory will be built in the Tula region
Now on home
Start of deliveries scheduled for 2027
Over 51,000 new motorcycles were sold in Russia in 2025
The car will take at least a year to assemble
The application's audience has reached 20 million users
The model will be included in the list of cars for taxis, price - from 2.25 million rubles
All parking lots of the "Administrator of the Moscow Parking Space" are connected to the service
The cars will be supplied to the Moscow Transport Service Directorate
Deliveries to India may begin in 2028
The technology provides automated search for all types of defects in power units
The plane flew 500 km, accelerating to 425 km/h
The plant stated that the information about the termination of purchases for models 6 and 8 is not true
Scientists are using the "Ekran-M" installation