In June 2025, the Kazan Aviation Plant restored another Tu-214 aircraft with tail number RA-64549. The 2008 aircraft was sent for painting and further transfer to the Russian airline Red Wings.
From the end of 2008 to 2015, the aircraft operated for Transaero, and then was put into storage in Kazan. The machine should last for many more years.
In June, RA-64549 was flown to Ulyanovsk for painting while still in the Transaero livery.
Now the aircraft will receive the corporate livery of the United Aircraft Corporation and will operate on Red Wings routes, where they decided to increase their fleet of Russian Tu-204/Tu-214 aircraft.
Earlier, www1.ru reported that Irkutsk Aviation Plant has radically updated the electrical systems of the Yak-130M.
Read more materials:
Support the legend: 46 billion rubles will be allocated for the production of Il-76
"Unrealistic." Aeroflot's plans to receive 200 MS-21 aircraft were predicted to collapse
Now on home
Hard and dense shot ensures the destruction of the target from the first hit, regardless of the drone's body material
Almost all body elements are zinc-treated
SOGAZ lost the case in court against UEC-UMPO
A rare SUV with a mileage of 38,533 km is offered for 2 million rubles
The government has included passenger and cargo airships among the key transport technologies of the future
Moscow sent 43 containers of weapons, including ATGMs and sniper rifles
There is a need to increase air traffic within Russia and abroad
Lada Niva Travel with a new 1.8-liter engine tested at temperatures of -25 and -30 °C
Производить первую энергию планировали ещё в апреле 2025 года
Retail is in second place, and education and medicine are in third place
The basic version of the system is capable of hitting targets at a range of up to 300 km
Security forces challenged the legality of yachting entertainment