Modernized Il-114-300 aircraft with 117ST-01 engines to be certified by 2025

ODK will ship a total of seven power plants

The Il-114-300 aircraft with domestic TV7-117ST-01 engines will be certified in 2025, with the first 6-7 power plants expected to be delivered by the end of the year. This was announced by Alexander Grachev, General Director of the United Engine Corporation (ODK, part of Rostec).

 Ил-114-300
Ил-114-300
This year, we are completing the certification of the Il-114 with TV7-117ST-01 engines, having already conducted over 100 flights, and active work is underway. This year, we will receive the corresponding certificate for the aircraft with the engine, and we will ship 6-7 engines this year.
Alexander Grachev, General Director of ODK

Grachev added that the certification of the domestic PD-8 engine for the import-substituted SSJ New is proceeding according to schedule.

The type certificate for the PD-8 engine is scheduled to be obtained in the fall of this year. In addition, ODK is in the active phase of serial deliveries of the PD-14 engine for the Russian MS-21 aircraft.

Earlier www1.ru reported that new Russian aircraft with a flying wing design will be 20% more economical than traditional airliners.

Read also:

New Russian Tango aircraft to enter mass production in 2026

ODK передала второй индустриальный двигатель АЛ-41СТ-25 для опытной эксплуатации

The latest MS-21-300 aircraft consumes half the kerosene of the Tu-154M

Sources
TASS

Now on home