Entrepreneur Gasanov started a lawsuit with the "Ulyanovsk Design Bureau of Instrument Engineering" due to debt
Il-114-300 is ready to fly to any location in the country
The event was attended by representatives of 14 Russian carriers
Aviation Expert Adamidov: Production of Il-114-300 Will Solve Aircraft Shortage Problem
Russian Prime Minister Mishustin inspected the aircraft at Innoprom
The cost of the Il-114 aircraft will be 2.6 billion rubles due to price recalculation
Engineers are working to increase the resource indicators of the power plant
The arrival of the aircraft in airlines will positively affect the transportation system in Russia
Developers have completely solved the technological challenges facing the airliner
UAC's initial plans did not fit into business logic
UAC production growth ensured by military equipment output
UAC is preparing to launch several large-scale projects on the market
Ulyanovsk "Il-Aviastar" is also involved in the production of the latest MS-21 aircraft
Components for the power plant are manufactured throughout the country
UEC will ship a total of seven power plants