The Il-114-300 aircraft is currently undergoing certification flights; in October, the developers will show a fully completed import-substituted machine with an interior. This was announced by the head of the Ministry of Industry and Trade, Anton Alikhanov.
According to him, the developers have solved the technological challenges facing the aircraft and are approaching the stage of either completing certification or starting certification flights.
Today, it is important to understand whether the volume of the market, the volume of demand from airlines, is confirmed, and to continue measures to expand production capacity in order to meet domestic demand.
Earlier www1.ru reported that a full cycle of production of PD-8 and PD-14 blades will ensure the independence of aircraft engine building in Russia.
Read more materials:
"Patriot Park" confused An-12 and An-26 aircraft at the exposition
Il-96 with PD-35 engines: details of the new long-range aircraft revealed in UAC
Now on home
The service contains data on 45,000 fraudulent sites
Modernized engines may equip the Lada Azimut crossover
The price is 132 billion 265.8 million rubles
The manufacturer plans to strengthen its lineup of light commercial vehicles
The production of carbon fiber was organized in the shortest possible time
Electric vans will speed up the repair of urban transport infrastructure
Countries are working to synchronize regulations in the field of AI
The service's average daily audience is 55 million people
Stable Isomaterial Based on Metakaolin Has a Density Below 300 kg/m³
Re-identification quality improved twofold with new DynaMix method
Russians will be able to find out about debts online