The Il-114-300 aircraft is currently undergoing certification flights; in October, the developers will show a fully completed import-substituted machine with an interior. This was announced by the head of the Ministry of Industry and Trade, Anton Alikhanov.
According to him, the developers have solved the technological challenges facing the aircraft and are approaching the stage of either completing certification or starting certification flights.
Today, it is important to understand whether the volume of the market, the volume of demand from airlines, is confirmed, and to continue measures to expand production capacity in order to meet domestic demand.
Earlier www1.ru reported that a full cycle of production of PD-8 and PD-14 blades will ensure the independence of aircraft engine building in Russia.
Read more materials:
"Patriot Park" confused An-12 and An-26 aircraft at the exposition
Il-96 with PD-35 engines: details of the new long-range aircraft revealed in UAC
Now on home
The machines received powerful engines and a bucket with an increased volume
Strike drones are equipped with mock-ups of R-60 missiles
Nikolai Patrushev: Weak Innovations Hinder the Fleet
The solution will speed up assembly and simplify the installation of onboard equipment
A data transmission scheme has been developed for the electric vehicle, separating technical and user traffic
Alexey Voevoda: the residual price of the aircraft is 300 thousand rubles
Rosstandart has introduced new formats of state license plates for personal mobility devices
Experts predicted the departure of imported brands from the market when the new rules for calculating payments come into force
The Federal Antimonopoly Service (FAS) has established that UEC-Saturn violates payment deadlines for small businesses
Dmitry Rogozin: Nuclear weapons are in very good condition and ready for use
The "Gonet" project is designed for a satellite system of up to 180 devices