The cost of the first three Russian Il-114 aircraft will be 4 billion rubles per unit, while subsequent ones, due to repricing, will cost 2.6 billion rubles. This was announced by the head of the Ministry of Industry and Trade, Anton Alikhanov.
According to him, the United Aircraft Corporation (ODK, part of Rostec) has a program to work with price pressure.
We are ready to support the creation of alternative suppliers to create pressure on the price of individual components. This applies to the price of the aircraft itself. For example, the Il-114, the first three units, each machine costs 4 billion rubles. The next aircraft will cost 2.6 billion rubles. This is on par with Bombardier, on par with ATR.
The third prototype Il-114-300 aircraft joined the flight test program in March, the aircraft consists entirely of domestic systems.
Three serial machines are currently in production. In 2025 it is planned to complete the certification of the Il-114 aircraft, deliveries will start in 2026.
The repricing formula - an algorithm according to which the price of a good is automatically recalculated depending on internal and external conditions. The formula may take into account: competitor prices, markup, product category, minimum margin, availability and turnover.
Earlier www1.ru reported that Import-substituted SJ-100 aircraft have completed half of the certification program.
Read also materials:
MS-21 and SJ-100 may become heavier by 400 kg?: What is fraught with painting aircraft
Tires in place: new satellite images of the airbase with Tu-95MS and Tu-160 have appeared
The test program of the import-substituted SJ-100 with PD-8 was only 50% completed
Now on home
Of the 678 passenger ships, some have been in operation for more than 30 years, all using internal combustion engines
The body volume exceeds 20 cubic meters - while the car remains within the dimensions of a standard chassis
Two relay satellites conducted 17 sessions of telemetry and command transmission during docking with the ISS
Deputy Nina Ostanina: Parents should protect children from gadgets
Along with Russians, citizens of Belarus, Tajikistan, and Uzbekistan were evacuated from the station
Three launch sites will operate simultaneously
Blogger KhaDm believes that the factory buys acoustics at the cheapest price
Attackers create fake registries and promote them to the top of search results
Ships of projects 21631 "Buyan-M" and 22800 "Karakurt" participated in maneuvers in the Baltic Sea
The electric train is assembled from domestic components and equipped with an asynchronous traction drive with microprocessor control.
Paris is launching a program to close the nuclear fuel cycle in order to stop relying on imports from Russia in 75 years