The first delivery will be a 58-ton intermediate heat exchanger for the station's fourth power unit
Hand luggage dimensions are recommended by Boeing
Expected production volume - up to 200 thousand batteries per month with future expansion
The car never knew the roads and was not registered with the traffic police
The reason for initiating the recall campaign is the absence of the ERA-GLONASS system in the vehicles
The cause of geomagnetic disturbances was a solar prominence ejected by the Sun
The thickness of the protective layer on the model's body is 147-158 microns
The vessel is in the design stage
The volume of such parts amounted to more than 20% in the first quarter of 2025
According to preliminary estimates, the model will account for 15% of sales in the crossover segment
This is the amount of unworked advance payment for diesel generators for four RSD59 project dry cargo ships
The term has been extended from 12 months to three years
Project 03830 vessels feature enhanced passenger comfort
Terms and place of delivery have not yet been specified
The spacecraft will feature ultra-high resolution
The vessel of project 15M is designed to ensure safety on waterways
The company plans to launch low-orbit communication satellites in hard-to-reach regions of the Arctic and the Far East
The property management department planned to sue the aircraft tire manufacturer "Shin-TEK" for a complex of production buildings
The barge of project REKG.107 is designed for the transportation of general cargo