
The most powerful icebreaker "Russia" will cost 26.2 billion rubles
The icebreaker of project 10510 is planned to be completed by 2030

The icebreaker of project 10510 is planned to be completed by 2030

The company is already building the first ferry for transporting tractors and equipment

Among the new projects are two pilot boats and a hybrid yacht

Cairo is considering the construction of a small nuclear power plant

The manifold is designed for installation depths of up to 500 meters

The equipment is used on nuclear icebreakers, floating power units, and small nuclear power plants

The two-layer structure of the tires guarantees high wear resistance and the ability to withstand loads

Construction to be completed in 2032

Russian-made simulators for training station operators will be delivered to China

The company "Criterion" has established small-scale production of components

New ferries will be built based on the projects of "Marshal Rokossovsky" and "General Chernyakhovsky"

The new equipment has no analogues in Russia and is produced mainly from domestic components with localization of more than 90%

The survey covered 173 top managers from various industries

Hot isostatic pressing ensures high quality of aircraft engine parts

Rosatom Supplied Turkey with a Reactor Vessel for the Nuclear Power Plant Under Construction