
550 hp underground: Tutayevsky Plant equipped a 45-ton BelAZ for Norilsk
The new mine dump truck was assembled at Nornickel's request and is already undergoing tests

The new mine dump truck was assembled at Nornickel's request and is already undergoing tests

The Russian company and the Belarusian enterprise have agreed on joint production

The company's enterprises already employ 15 demolition robots, while autonomous rock breakers and dump trucks are undergoing testing

The new LHD received a 480 hp engine, reinforced frame, and electronic control systems

Rosatom will not be able to participate in the development of the Tolillar deposit

Kola Mining and Metallurgical Company Modernized Equipment

Since the 1990s, there has been virtually no domestic production of this strategically important raw material

Belarusian and Russian specialists are developing import-independent machines for underground operations

Navigation equipment determines vessel coordinates in the absence of a GPS signal

The machine was equipped with asynchronous electric motors with a total power of 145 kW

The new RS3-41-10 complex allows drilling wells up to 1500 meters with real-time trajectory control

New platform will select alloy properties even before their creation in the laboratory

Platinum prices rose by 70%, palladium by 48%

The developments are planned to be brought to the industrial level as early as the third year after the start of the project