The United Shipbuilding Corporation (USC) and "Severnaya Verf" intend to implement a large-scale expansion. But a serious obstacle has arisen in their path — the artificial island of Krivaya Damba, located in the port area.
Eliminating the obstacle will require about ten billion rubles, as well as the disposal of soil contaminated with oil products.
The corporation expects that after the reconstruction, for which it is planned to allocate at least 300 billion rubles, the shipyard will be able to build ships up to 350 meters long.
However, the disposal of contaminated soil is a difficult task. It has not yet been revealed how the island will be excluded from the general plan.
The best way to solve this issue from a hydrological point of view is being determined. When it is ready, we will announce it. We are having a discussion with the city, we are actively conducting it, everyone understands that we will need to resolve the issue of the Crooked Dam, but the matter is now with the specialists.
Additional difficulties arise from the fact that the rights to use Krivaya Damba belong to JSC "Sea Port of St. Petersburg" until December 2046. This means that any attempts to demolish it will depend on the need for negotiations, the redemption of rights or compensation, or we will have to wait for the end of the lease term.
Earlier, www1.ru reported that USC is designing a new shipyard on the basis of "Severnaya Verf".
Read materials on the topic:
Now on home
The reason for indexation may be inflation, an increase in VAT, and rising production costs
The Ministry of Industry and Trade believes that the increase in the levy will not affect responsible manufacturers
The crew accelerated the aircraft to 580 km/h instead of the cruising speed of 450 km/h
Ship equipment comes to Russia from China at inflated prices
Almaz-Antey and the Belarusian Ministry of Defense signed a contract for equipment maintenance
The complex's computing resources allow for the competent distribution of targets between launchers
Among the spacecraft are Aist-2T No. 1 and No. 2
Deputy Prime Minister Novak announced a postponement of the deadlines, but confirmed the commitment to developing the sector
Design engineers without experience are promised salaries from 80 thousand rubles
Hard and dense shot ensures the destruction of the target from the first hit, regardless of the drone's body material
Almost all body elements are zinc-treated
SOGAZ lost the case in court against UEC-UMPO