
130 new machines will speed up production of PD-8 and PD-14 aircraft engines
The equipment was installed at the ODK-STAR enterprise

The equipment was installed at the ODK-STAR enterprise

The tractors performed excellently both in solo operation and in a paired configuration

The subject of the claim was the fulfillment of the company\'s obligations

The new product will reduce weight and improve the reliability of ship systems

Serial deliveries of the new product are planned for mid-2026

Specialists completed foundation bed preparation and waterproofing, proceeding to install the reinforcement cage for the "first concrete"

The crane will make it possible to handle larger vessels faster

Pouring the first concrete opens the way for equipment installation and building construction

Work on Power Unit No. 5 includes maintenance of key equipment

Vodka and pharmaceutical alcohol production were hit especially hard, with declines of up to 56%

The joint development of Rostec enterprises uses fully domestic components

The proposed design simplifies maintenance of the unit and speeds up replacement during repairs

In January, the unit successfully passed bench tests

The sides are also discussing localization of fighter jet production in the republic

Gidromash increased output of landing gear for the domestic airliner by 14%