The icebreaker of project 10510 is planned to be completed by 2030
The icebreaker of project 10510 is planned to be completed by 2030
The company is already building the first ferry for transporting tractors and equipment
Among the new projects are two pilot boats and a hybrid yacht
Cairo is considering the construction of a small nuclear power plant
The manifold is designed for installation depths of up to 500 meters
The equipment is used on nuclear icebreakers, floating power units, and small nuclear power plants
The two-layer structure of the tires guarantees high wear resistance and the ability to withstand loads
Construction to be completed in 2032
Russian-made simulators for training station operators will be delivered to China
The company "Criterion" has established small-scale production of components
New ferries will be built based on the projects of "Marshal Rokossovsky" and "General Chernyakhovsky"
The new equipment has no analogues in Russia and is produced mainly from domestic components with localization of more than 90%
The survey covered 173 top managers from various industries
Hot isostatic pressing ensures high quality of aircraft engine parts
Rosatom Supplied Turkey with a Reactor Vessel for the Nuclear Power Plant Under Construction