
Ultrasonic installation for processing ultra-strong ceramic materials in aviation and rocket engineering created at MAI
Engineers reduced the risk of defects and accelerated the production of parts by 10 times

Engineers reduced the risk of defects and accelerated the production of parts by 10 times

The capabilities of power grids and energy generation in Yakutia are planned to be developed

The process resembles high-tech "gardening"

The tests brought the receipt of a type certificate for the new installation closer

New equipment improves the quality and efficiency of electric locomotive bogie frame production

Russia and Belarus have a number of joint import-substitution projects

The equipment operates around the clock

Products are ready for implementation in production

A unified model for interaction with RMS reduces integration costs and shortens timelines

The system processes up to 950 items per hour

The company will produce units with a capacity of 700 to 4500 kW for shipbuilding and coastal energy

The propulsion units are designed for medium-tonnage vessels

A series of experiments were conducted in Dimitrovgrad

From 2026, licenses for geological exploration of placer gold on a declarative basis may be prohibited

Russia leads in the share of profitable diamond reserves in the world