
Two in mind, four in hand: ODC shipped PD-14 for another MC-21
The power plants were delivered to the Irkutsk Aviation Plant, while the second production liner is undergoing ground tests

The power plants were delivered to the Irkutsk Aviation Plant, while the second production liner is undergoing ground tests

Part of the already constructed facilities will have to be dismantled and rebuilt

The Prosecutor General's lawsuit mentions Andrey Perepelitsa's citizenship, but the company states he is a Russian citizen

The equipment underwent hydraulic tests and control assembly before installation on the power unit

The plant was commissioned late, and an expert examination revealed limitations for its operation in the wholesale market

Fuel is supplied directly into the rotor channels, where compression, injection, and intermittent combustion occur

Laboratories, engineering departments, and production facilities will be located on a site of about 30 thousand square meters

The Ministry of Industry and Trade supported the idea of partially compensating enterprises' costs for implementing domestic APCS

"OKBM Afrikantov" manufactured equipment for the primary circuit of the fast neutron reactor

Workers are expected to have qualifications no lower than the 4th grade, with a promised salary of 350 thousand per month

Three facilities with an area of about 90 thousand m² are being created to ensure serial production of aircraft

Six compositions showed low thermal conductivity, high temperature stability, and radiation resistance

A higher coefficient is proposed for devices outside the "Chestny Znak" system

Omsk engine builders tested domestic fluid on heat-resistant alloys for CNC machines

Bloomberg: The company is exploring the possibility of selling Windalco and the mothballed BCGI