
Copying foreign technologies slows down the aviation industry in Russia
Expert Raspopov: problems manifest at the level of materials, technologies and certification

Expert Raspopov: problems manifest at the level of materials, technologies and certification

Upgrading safety systems and turbines has increased the reliability of the unit

Safety devices for VVER-1200 reactor are ready for installation in Turkey

The unit can be expanded without modification, even the gas composition changes

Yamal gas accounted for 97% of supplies to the EU amid formal preparations for a full embargo

The installation will withstand vacuum, radiation, and two weeks of lunar night at −150°C

The new design improves the efficiency and consumption characteristics of the device

Resident of the industrial park started producing equipment for automation of power transmission lines

Head of Roscosmos Dmitry Bakanov reported to the President on the readiness of the facility

A field test showed that the complex operates without overload and maintains stable performance

Minsk Tractor Works Showed Its Machines in Peru and Ecuador

Strategic raw materials for batteries have been learned to be extracted as a byproduct - without billions of investments in new infrastructure

The equipment handles sunflower, soybean, rapeseed, and flax

Alexander Vinogradov appointed to replace Valery Maltsev: he headed the trailed equipment division for more than 15 years