
HSM track structure tested with double load: 8 pulsators press the "track cake"
The structure will withstand trains at 400 km/h, tests are equivalent to 50 years of service

The structure will withstand trains at 400 km/h, tests are equivalent to 50 years of service

Assembly of EVS360 cars enters pre-commissioning phase

Another 69 components are currently in the testing phase

The complex is equipped with a new head with a upsetting force of 140 t·s

VNIIT engineers simulate a load of 120 kN and stop a train in 90 seconds

The first two trains will be sent for certification tests in 2027

Equipment is being installed and rails are being laid in the assembly shops in Verkhnyaya Pyshma

A unique 380 Ah power unit is assembled entirely from Russian components and is ready for installation on trains

The design has passed fatigue testing and is ready for certification

Separating passenger and freight traffic will save Russian companies trillions of rubles by 2050

The crossings will allow the construction of a permanent bridge over eight kilometers long to begin

The SOB-400A Complex Developed by NIIAS Specialists is Being Tested at Speeds Over 250 km/h

Authorities разрешили to build tracks in the city center

The enterprise will supply interior solutions for train cars and driver's cab blocks