
Ministry of Transport Reveals HSR Construction Schedule Until 2028
The pilot section will become a testing ground for domestic trains, and the entire line will be the basis of a new transport network

The pilot section will become a testing ground for domestic trains, and the entire line will be the basis of a new transport network

Travel time from Moscow to Valdai will be one hour

The construction involves 14 thousand specialists and almost 5 thousand units of equipment

New technology will ensure the movement of HSR trains at speeds up to 400 km/h

The launch of the new high-speed rail line is scheduled for 2028

To solve the problem of construction on swampy soils, it is planned to drive more than a million piles with a total length of 12 thousand kilometers

HSR project will increase export cargo flow towards seaports

They are of Russian production, the entire component base is domestic

"HSR Two Capitals" will receive funding from the government and additional funding from the regions

High-speed rail trains will travel at a speed of 400 km/h

It will be possible to get from Moscow to St. Petersburg in 2 hours 15 minutes