
Construction of Passenger Vessel Project F2 Begins in St. Petersburg
Shipbuilders from the "Rechnoy" shipyard are working on the project

Shipbuilders from the "Rechnoy" shipyard are working on the project

The RST38 project bilge water collector can be controlled remotely

Tests have shown that the electrical equipment is capable of operating under extreme loads

The non-self-propelled pontoon facility is designed for repairing ships with a docking weight of up to 5 tons

The commercial vessel of project 03141 is equipped with RSW tanks for storing live catch

Alternating voltage of the complete busbar - 1000 V

The vessel of project 03070 will be operated in the Far East

The construction is carried out by shipbuilders of the Livadia Ship Repair Plant

The vessel of project 04130 is designed for catching and transporting fish to a coastal factory

Consumables are used for welding parts of ship hulls and floating drilling rigs

Russian Maritime Register of Shipping Approves Preliminary Design of Passenger Vessel

The vessel of project 04580 "Kotlin" accommodates 197 passengers

The vessel will be transferred to the Lenin Fishing Collective Farm

Equipment manufactured by Electrophysica ensures the operation of propulsion electric motors