Shipbuilders of SPC "Torsiotes" have completed the construction of the seiner "Avacha" (project 04130) in Petropavlovsk-Kamchatsky. This was reported by the press service of the Russian Maritime Register of Shipping.
"Avacha" is the fifth vessel in the series, which is being built by order of the V.I. Lenin Fishing Collective Farm. The seiner is designed for catching and transporting fish in raw form to a coastal factory. The vessels can be operated all year round.
Project 04130 provides for six units. The completion of the construction of the last one is scheduled for June 2025.
Characteristics of vessels of project 04130:
- Length — 26.45 m
- Width — 8 m
- Draft — 8 m
- Engine power — 441 kW
- Displacement — 306.3 t
- Hold volume — 90 cubic meters
- Crew — 7 people
Read more on the topic:
Transformers TSZ-2500/10-OM4 approved for installation on icebreakers of project 22220
Fishing seiner "Karymai" was built at SPC "Torsiotes" in Petropavlovsk-Kamchatsky
Small seiner-trawler "Nikolai Nechai" underwent a major modernization