The Ufa enterprise UEC-UMPO (part of the United Engine Corporation of the Rostec State Corporation) has been audited and confirmed that it meets all the requirements for the production of parts for the fifth-generation PD-14 aircraft engine.
The successful completion of the certification audit indicates that UEC-UMPO ensures the production of PD-14 parts and components in full compliance with the requirements for quality and reliability. Our enterprise also possesses all the competencies necessary for the overhaul of parts and components of this engine.
Experts from the commission of the Federal Air Transport Agency (Rosaviatsiya) visited the divisions involved in the production of parts and components of the PD-14 engine and studied the technical and production documentation. The inspection confirmed that the production of parts and components of the PD-14 engine at UEC-UMPO meets the requirements of Russian air legislation.
The Ufa enterprise UEC-UMPO manufactures key components for aircraft engines, including fan blades, high-pressure compressor rotor parts, separation housings, and low-pressure turbine modules with rear support. The company is responsible for the manufacture of more than 33% of all parts and components of the PD-14 engine, designed for medium-range aircraft.
Earlier www1.ru reported thatthe modernized Yak-130M combat trainer aircraft will be presented at the Partner-2025 exhibition in Belgrade.
Read more materials:
- "4+" generation fighter-bombers Su-34NVO began to be equipped with modernized UMPC-PD
- "Piracy and illegal seizure": technical inspection of the confiscated An-124 "Ruslan" began in Canada
- A full-size model of the AM-38F aircraft engine for the MiG-3 attack aircraft was recreated on a 3D printer by engineers from UEC-Kuznetsov
Now on home
The company switched to the Yadro technology stack to improve server management
The complex remained on the KamAZ-6560 chassis and is capable of using two types of anti-aircraft missiles
Over the past 5 years, 140 thousand km of roads have been built and repaired in Russia
The surcharge for the 4x4 hybrid version is 305 thousand rubles
Plans to Improve Verification Procedure on "Gosuslugi" Portal
The Lipetsk Mechanical Plant updated the ventilation system of the hull production
The development reduces the activation energy of thermal decomposition by 25%
"Lenmorniiproekt" has started searching for contractors to carry out the work
Tests of Wire for Tokamak Electromagnetic System Conducted for the First Time
The plant's new components feature reduced noise and high meshing accuracy
The holding acquired 258 electric locomotives and 141 diesel locomotives
The aircraft with hydraulic cylinders and a rotary wing design will be able to carry up to 40 people