Specialists from the Central Aerohydrodynamic Institute (TsAGI) have completed certification ground tests of the landing gear and integrated control system of the import-substituted MC-21-310.
The work was carried out by order and with the support of PJSC Yakovlev at the Irkutsk Aviation Plant. TsAGI recalled that testing is a mandatory stage for new aircraft and their modifications in the final stage of preparing aircraft for their first flight.
In the course of experiments at TsAGI, the frequency characteristics of the landing gear struts and import-substituted control systems were determined under various conditions of configurations and settings of the MC-21-310 systems.
Based on the test results, specialists from FAU TsAGI and PJSC Yakovlev will conduct appropriate calculations and expert review of the results.
Read more materials:
A new cockpit design has been developed for the Kazan Tu-214
ODK Guarantees After-Sales Service for VK-650V Engines
Rostec explained the unusual silver color of the import-substituted SJ-100
Now on home
Vietbao: the Checkmate project will ensure the economic viability of fighters
The product combines high autonomy and accuracy
The Ministry of Internal Affairs will have the right to block operators for fake diagnostic cards without the participation of insurers from September
The technology helps plants grow faster and increases the volume of raw materials for brewing
Companies are massively changing their status in order not to lose online borrowers
The air defense system crew called the American UAV a very difficult target
STGT has increased the service of gas turbines, with 34 units already in operation
Alexander Khrolenko: only China, North Korea and Iran have reached the creation of hypersonic weapons
Illegal cryptocurrency mining could be punished with millions of rubles
Volunteers have established continuous 3D printing of casings, which are then filled with plastic explosive
The airliner arrived in Arkhangelsk to undergo icing tests