It is planned to resume ship construction and create a large logistics terminal on the basis of the former Volgograd Shipbuilding Plant. The initiative belongs to a business group from Iran.
The project covers an area of approximately 70 hectares. The plans include a modern container terminal with customs warehousing, climate-controlled storage facilities and areas for bulk cargo. It is expected to expand Iran's access to Russian and European markets through international transport corridors.
Iranians want to increase shipbuilding capacity, and Volgograd's convenient geographical location between the Caspian and Black Sea basins makes it suitable for cargo handling and fleet renewal.
The Volgograd Shipbuilding Plant has changed owners more than once in recent years. In April 2019, the company was acquired at auction by an individual entrepreneur for 323,900,050 rubles. Four years later, the plant was resold again, already for the one who bought it for 427,999,999 rubles.
Read also on the topic:
The fourth block of the Amurets pontoon dock was assembled at the Amur Shipbuilding Plant
The court will consider the claim of the Rostec structure for bankruptcy of the Pella shipyard
Now on home
The service contains data on 45,000 fraudulent sites
The state has accelerated the introduction of unmanned solutions, integrating them into the real sector of the economy
Modernized engines may equip the Lada Azimut crossover
The price is 132 billion 265.8 million rubles
The manufacturer plans to strengthen its lineup of light commercial vehicles
The production of carbon fiber was organized in the shortest possible time
Electric vans will speed up the repair of urban transport infrastructure
Countries are working to synchronize regulations in the field of AI
The service's average daily audience is 55 million people
Stable Isomaterial Based on Metakaolin Has a Density Below 300 kg/m³
Re-identification quality improved twofold with new DynaMix method
Russians will be able to find out about debts online