"Ural Locomotives" has certified the "Finist" dual-system high-speed electric train. The certificate is issued for a period of 5 years and is valid until July 2030.
This allows the plant to begin mass production of new electric trains. The factory acceptance commission has determined a pilot series of 60 units.
The launch of "Finist" trains on Russian railways will optimize the passenger transportation schedule and increase the comfort of travel on sections where it is necessary to switch from one type of current to another. This will also lead to savings in time and resources on such routes.
The ES105 dual-system train is equipped with a domestic traction system and auxiliary equipment. The five-car train has 386 seats and the number of seats for passengers with disabilities has been increased to four. The cars are equipped with microclimate and air disinfection systems, lifts for people with limited mobility, as well as a passenger counting system at the entrance and places for sports equipment, including bicycles, skis and snowboards.
Earlier www1.ru reported that TADEР315-6U1 electric motors passed certification.
Read materials on the topic:
Acceptance of the new eight-car electric train ES104 "Finist" has been completed
The dual-system electric train "Finist" of the ES105 series has been sent for testing
Now on home
The reason for indexation may be inflation, an increase in VAT, and rising production costs
The Ministry of Industry and Trade believes that the increase in the levy will not affect responsible manufacturers
The crew accelerated the aircraft to 580 km/h instead of the cruising speed of 450 km/h
Ship equipment comes to Russia from China at inflated prices
Almaz-Antey and the Belarusian Ministry of Defense signed a contract for equipment maintenance
The complex's computing resources allow for the competent distribution of targets between launchers
Among the spacecraft are Aist-2T No. 1 and No. 2
Deputy Prime Minister Novak announced a postponement of the deadlines, but confirmed the commitment to developing the sector
Design engineers without experience are promised salaries from 80 thousand rubles
Hard and dense shot ensures the destruction of the target from the first hit, regardless of the drone's body material
Almost all body elements are zinc-treated
SOGAZ lost the case in court against UEC-UMPO