The project of the new LMS-192 "Osvey" aircraft is currently in the stage of interstate coordination by Belarusian specialists, according to the Minister of Industry and Trade of Russia, Anton Alikhanov.
According to him, Russia has completed the development of the technical parameters of the project. A positive conclusion from Belarus is now expected.
We are waiting for a positive conclusion to continue the development of the working design documentation directly.
The "Osvey" project is a joint initiative of Russia and Belarus to create a new 19-seat twin-engine turboprop aircraft designed for flights on local routes.
The aircraft is being developed by specialists from the Ural Civil Aviation Plant (UZGA). Approval of the aircraft parameters by Belarusian experts is required to proceed to the design of the aircraft structure.
Read also:
MS-21 and SJ-100 May Become 400 kg Heavier?: What Aircraft Painting Entails
Tires in Place: New Satellite Images of Airbase with Tu-95MS and Tu-160 Appear
The testing program for the import-substituted SJ-100 with PD-8 has been completed by only 50%
Now on home
Start of deliveries scheduled for 2027
Over 51,000 new motorcycles were sold in Russia in 2025
The car will take at least a year to assemble
The application's audience has reached 20 million users
The model will be included in the list of cars for taxis, price - from 2.25 million rubles
All parking lots of the "Administrator of the Moscow Parking Space" are connected to the service
The cars will be supplied to the Moscow Transport Service Directorate
Deliveries to India may begin in 2028
The technology provides automated search for all types of defects in power units
The plane flew 500 km, accelerating to 425 km/h
The plant stated that the information about the termination of purchases for models 6 and 8 is not true
Scientists are using the "Ekran-M" installation