The SKIF synchrotron ("Siberian Ring Photon Source") being built in the Novosibirsk region now uses Russian climate systems to protect the control electronics. The development and supply of equipment was undertaken by "Utilex", which created 170 sealed cabinets with precision control of temperature, humidity and smoke.
Previously, it was planned to purchase German Schroff systems for these purposes, but due to supply restrictions, it was necessary to quickly switch to domestic solutions. Each cabinet is equipped with remote control and parameter monitoring, which is critical for the stable operation of the synchrotron.
The biggest "challenge" was the need to quickly scale up production by almost 10 times. Before that, we produced several dozen micro-DPCs per year at most, and in the SKIF project we needed to produce 170 complexes within seven months.
Some of the equipment has already been put into operation, including cabinets for the transport channel from the accelerator to the storage ring. Electrical installation of systems for the storage ring is now being completed. In addition, Utilex engineers modernized the previously purchased Schroff cabinets, adding control sensors to them.
The SKIF synchrotron is a fourth-generation facility where an electron beam is accelerated to 3 GeV. Precise control of its orbit requires ultra-stable electronics that are sensitive to temperature and humidity fluctuations. Russian climate cabinets provide micron-level positioning accuracy of the beam, which directly affects the quality of scientific experiments.
Read also related materials:
Production of high-tech components for machine tool building launched in Chelyabinsk
A device for ultra-precise experiments with cells was developed at ITMO
Aerosol printer for printing microcircuits and neuroimplants developed by Russian scientists
Now on home
The reason for indexation may be inflation, an increase in VAT, and rising production costs
The Ministry of Industry and Trade believes that the increase in the levy will not affect responsible manufacturers
The crew accelerated the aircraft to 580 km/h instead of the cruising speed of 450 km/h
Ship equipment comes to Russia from China at inflated prices
Almaz-Antey and the Belarusian Ministry of Defense signed a contract for equipment maintenance
The complex's computing resources allow for the competent distribution of targets between launchers
Among the spacecraft are Aist-2T No. 1 and No. 2
Deputy Prime Minister Novak announced a postponement of the deadlines, but confirmed the commitment to developing the sector
Design engineers without experience are promised salaries from 80 thousand rubles
Hard and dense shot ensures the destruction of the target from the first hit, regardless of the drone's body material
Almost all body elements are zinc-treated
SOGAZ lost the case in court against UEC-UMPO