The Ural Civil Aviation Plant (UZGA) is developing a post-sales service system for Russian regional aircraft, which are being developed at the aircraft plant's facilities, as well as in partnership with Belarus.
The project will cover the supply of spare parts, repair of propellers and engines, maintenance of LMS-192 "Osvey", LMS-901 "Baikal" and TVRS-44 "Ladoga" aircraft. Customers will have access to a 24/7 support center operating on a "single window" principle.
The plant pays special attention to the training of aviation personnel for new types of aviation equipment.
Thanks to the interactive hardware and software complex, the process of training and retraining of aviation specialists and civil aviation pilots will become as efficient as possible, helping to master new types of equipment faster and practice procedures for interacting with aircraft systems.
The training interactive hardware and software complex for the LMS-901 "Baikal" aircraft will use electronic training materials, interactive equipment models and knowledge control tools to train specialists.
The UZGA project aims to create a closed support cycle for Russian airlines. The comprehensive service will increase the reliability of operation of regional aircraft and reduce dependence on foreign suppliers.
Earlier, www1.ru reported that in Russia it was proposed to deploy laser systems to protect against UAVs.
Read also materials:
Carriers of "Caliber" and "Uran" of the Russian Navy sailed to the shores of India
200 aircraft will be built in Russia by 2030: there are guaranteed buyers with money
Dagestan has developed its own autopilot aircraft that runs on 95 gasoline
Now on home
The station may remain in operation after 2028 in order not to disrupt the transition to new orbital projects
Honored Pilot Yuri Sytnik: the reliability of Tupolev aircraft is beyond doubt
The chatbot has learned to analyze documents, help with studies, and create images without limits
ODK-Klimov reduced the amount of claims to PJSC Rostvertol
The algorithm learns to understand the depth of a scene through shadows, perspective, and overlaps
Nikolai Talikov: I believe that everything will be fine with the Il family
They want to get 203 million rubles for the unfinished "Pallada-50" project 19371
A data center the size of a field will keep the marketplace under load
Project 12700 "Alexandrite" ships are equipped with the "Livadia-M" mine detection sonar station
GTLK's assets increased to 1.3 trillion rubles
The schedule adjustment is related to the preparation of the Baiterek launch complex