The State Corporation "Rosatom" has sent new equipment to the Rostov Nuclear Power Plant. It will be used to modernize the safety system of the first unit, the corporation's press service reported.
This refers to equipment for an automated process control system (APCS), developed by "Rosatom Automated Control Systems". This includes 20 cabinets and 40 detectors that transmit data about the technological process to upper-level systems, as well as to the unit and backup control rooms.
According to the chief engineer of the nuclear facility, Andrey Gorbunov, the equipment upgrade began in 2023. This year, about 4.5 billion rubles will be allocated for these purposes. The work is expected to be carried out as part of a scheduled repair, which is scheduled for October.
The Rostov Nuclear Power Plant is located near the Tsimlyansk Reservoir. The facility was commissioned in 2001. The electrical capacity of the four operating power units is 4071 MW.
Read more on the topic:
First power unit of Rostov NPP disconnected from the grid due to a defect
Huge ocean of energy: 11 new nuclear power plants to be built in Russia in the next 18 years
Now on home
Герой России Гарнаев: никто из профессионалов о возобновлении производства на КАЗ всерьёз не говорит
Система отслеживает спутники на высотах до 50 000 км и ведёт за ними наблюдение
The armored vehicle is equipped with a KamAZ-740.35-400 diesel engine with a power of 400 hp.
Constant improvements in avionics, weapons and tactical capabilities will make the aircraft a flexible response to future challenges
The exterior of the KamAZ-54901 features fairings on the cab and chassis for fuel economy
Fighters are in demand both domestically and abroad
Tyazhpromexport and Venezuela Agree on Plant Revival
The company not only completed the state order, but also quickly mastered the production of AK-12K for special forces
Experts have developed a photogrammetric complex with a resolution of less than 1 cm