The start of mass production of the long-range aircraft Il-96-400M will open new horizons for Russian civil aviation in transport and passenger transportation. Producing new equipment for civil aviation is a crucial task for the transport industry.
This includes not only the latest aircraft engineering developments, but also establishing the production of already flying aircraft. Postponing the commissioning of new SJ-100 and MS-21 aircraft only further emphasizes the importance of increasing the production of aircraft such as the Il-96 and Tu-214.
The latest projects do not need to undergo certification, which means they only depend on production. In this regard, the Il-96 aircraft is the only one that has maintained the planned production rates of aircraft in the domestic civil aviation.
The deadlines are encouraging
The fuselage went through all stages of slipway assembly in 3 months, which is the shortest assembly cycle in recent years. Now this 18-ton unit has been sent to the final assembly shop.
According to the Comprehensive Program for the Development of the Aviation Industry in Russia until 2030, the first deliveries of the Il-96-400M are scheduled for 2025 in the amount of two aircraft. Further production is planned annually at 2 aircraft, which corresponds to the planned rates.
Who are the customers
The number of passengers carried in the Il-96-400M has increased to 370 people, for this the fuselage was lengthened by 9.65 m. Unlike the Il-96-300, the airliner has an operational ceiling of up to 13,100 m, which reduces fuel consumption on long-distance flights. At the same time, the range of the new machine, depending on the take-off weight, can reach 10,000 - 13,000 km.
The Ministry of Defense of Russia may also become a customer of the Il-96-400M, since the characteristics of the machine provide the possibility of using it as a tanker or an airborne command post, replacing aircraft such as the Il-86VCP.
Earlier www1.ru reported that Ilyushin announced the official characteristics of the serial Il-114-300.
Read also:
Russian airline ready to buy up to 100 Tu-214 aircraft: hope for the Kazan Aviation Plant
MS-21-310 aircraft received a new generation power supply system: a completely Russian development
Aviation pump for MS-21, SJ-100 and Tu-214 became 17% lighter
Now on home
Герой России Гарнаев: никто из профессионалов о возобновлении производства на КАЗ всерьёз не говорит
Система отслеживает спутники на высотах до 50 000 км и ведёт за ними наблюдение
The armored vehicle is equipped with a KamAZ-740.35-400 diesel engine with a power of 400 hp.
Constant improvements in avionics, weapons and tactical capabilities will make the aircraft a flexible response to future challenges
The exterior of the KamAZ-54901 features fairings on the cab and chassis for fuel economy
Fighters are in demand both domestically and abroad
Tyazhpromexport and Venezuela Agree on Plant Revival
The company not only completed the state order, but also quickly mastered the production of AK-12K for special forces
Experts have developed a photogrammetric complex with a resolution of less than 1 cm