ODK-Perm Motors also developed a nozzle guide vane and stator
Specialists will replace about 40 imported systems and components
The third aircraft will be fully import-substituted
The liner was in the air for about 40 minutes
Computer modeling was used to speed up the certification of power plants
A large number of brackets and mounts are located on the power unit
The system controls important parameters for efficient and economical operation of the power plant
The latest digital platform will allow to quickly receive technical documentation and track data on the use of power units
The power unit was mounted on the prototype aircraft 95157
ODK-developed units will cover the needs of aircraft manufacturers in all segments
Flight tests will begin after the completion of ground tests
The dual-circuit turbofan engine was developed using advanced technologies
A specialization center for assembling doors and hatches for SJ-100 aircraft was previously created in Komsomolsk-on-Amur
The turbofan engine was developed using the latest domestic materials and advanced technologies
Aircraft Ready for Transition to Domestic PD-8 Engines in 2025