The aircraft will replace the outdated fleet of Soviet An-24/26 and Yak-40
Certification of the "Baikal" aircraft is expected by December 2026
The system is designed for heavy airliners, and the rules turned out to be unworkable due to cumbersome procedures
The power plant will equip the LMS-901 Baikal, UTS-800 and LMS-192 Osvey aircraft
Mass production of the aircraft will start in 2027
The aircraft has about 800 composite parts, each of which is made without a single drawing
Thanks to the machines, UZGA can create large-sized parts from composites
Previously, the aircraft manufacturing enterprise had a new CEO
Classrooms will be equipped with modern technology and interactive training models
Turboprop machines still haven't taken to the skies
The "Aerokhimflot" alliance will receive 50 aircraft from 2027 to 2031
The aircraft will be delivered to the "Aerokhimflot" alliance from 2027 to 2031
Igor Ozar Takes Office as Director of UZGA
The unit is entirely made of domestic materials and has no analogues
UZGA stated that the domestic power plant is more economical and powerful