
Seiner "Oktyabrsky" built in Petropavlovsk-Kamchatsky
The vessel of project 04130 is designed for catching and transporting fish to a coastal factory

The vessel of project 04130 is designed for catching and transporting fish to a coastal factory

USC shipbuilders began installing equipment on the Project 22220 vessel

The first innovative train will be launched on the Big Circle Line in 2025

The off-road vehicle has a payload capacity of 4 tons

The fuel tank capacity of the model is 240 liters

The L5 cab can be installed on the chassis of tractors from various manufacturers

The system will operate on the basis of ERA-GLONASS

By 2035, the fleet of gas locomotives will number 149 units

In 2025, it is planned to produce 8,256 polymer separators

Filling stations are planned to be built in St. Petersburg, Murmansk, Arkhangelsk and other key ports

Missile carrier of project 903 was developed at the Central Design Bureau for Hydrofoil Ships named after Alexeev

The RST-25/7 project vessel meets international standards for the transportation of petroleum products

Sales fell by 10% compared to last year, with Russian brands in the lead

The Project 04580 vessel was built under a state-funded program