
Moscow Metro Ranks Among World Leaders in Construction and Fleet Renewal Rates
By 2030, the share of modern trains will exceed 90%

By 2030, the share of modern trains will exceed 90%

The municipal vehicle is designed to transport 22 cubic meters of waste

Project 23160 SPK from OSK develop speeds over 35 knots

The system itself calculates the time until re-profiling and recommends tire replacement

The "Mudyug" class vessel was fully disinfected

Another 69 components are currently in the testing phase

The complex is equipped with a new head with a upsetting force of 140 t·s

Experts from the two countries are preparing a feasibility study for a new logistics corridor through Afghanistan

The service launched in Sormovsky, Kanavinsky, and Moskovsky districts of the million-plus city

Two 2000 kW generators will provide power to Project 22220 vessel without fuel preheating

More than 100 autonomous trucks are already operating on Russian roads

Technical fleet vessels have excavated over 43 thousand cubic meters of soil

The unit for the Project 22220 giant passed its control inspection and will serve for at least 40 years

The mass of the retaining device with balanced flukes will be 5858 kg

Vessels of the "Moskva 2.0" project are being built at the Emperium shipyard