
Improved design with external reinforcement: the floating oil storage facility "Stalebeton 0-01" built in St. Petersburg
The vessel of project 04650 can be moored at a berth or grounded

The vessel of project 04650 can be moored at a berth or grounded

The new vessel is designed for 140 passengers and can operate for up to 8 hours without recharging

Project L390 vessel built at the "Paritet" shipyard in the Yaroslavl region

Pilot in St. Petersburg and Kaliningrad will automatically filter out minors before a ride

The emergency rescue vessel is designed for port operations

NovSU technology will help increase yields and reduce carbon emissions

SVP-50 Equipped with Two KAMAZ R6 In-line Diesel Engines

The device simulates different types of road surfaces

The mountain electric bicycle is equipped with a torque sensor

The production program for 2026 is 100% formed

Eight modules with sensors instead of manual weighing automate adjustment for locomotives

The project will be launched together with the Bank of Russia and VTB after the payment infrastructure is prepared

Transport with a carrying capacity of 1000 kg will serve the enterprise's workshops

Rosneft does not plan to introduce restrictions