How ordinary floor markings in workshops raised output by 46%
How ordinary floor markings in workshops raised output by 46%
The corporation called the 150-hour tests an important stage before mass production
A new claim against Rusaviaprom for 6 million rubles has been filed by Aviaspektr.
The court recovered 30 million rubles from the TBS machine tool plant for disrupting the order of Kurganmashzavod
Claims and debts have hit aviation, shipbuilding, and defense plants
The solution reduces heating, increases efficiency, and makes unit repairs easier
ODK-UMPO posted a vacancy for the position of grinder
The recovery from the A. G. Shipunov Design Bureau remains in force; the plant made an error when filing its appeal
The new material withstands record pressure
The cause of the huge losses was a sharp drop in overseas deliveries
The structure was assembled from aluminum profiles joined by friction stir welding
State expertise approved the modernization project for Nizhny Novgorod-based NPP "Polyot"
No special lifting devices are needed to raise the power unit
The workshops occupy 140 thousand square meters
Aviastar is ramping up aircraft production