
Predicts Events in 30 Minutes: AI System to Support Operators Implemented at Novovoronezh NPP
New system reduces the load on station operators

New system reduces the load on station operators

The stations are equipped with a heating system and air cooling

Next stage is the installation of the reactor vessel

The radiation background at the site and in the observation zone is normal

Plan for Introducing Russian Microelectronics Equipment: 122 Installations by 2032

There are no more sanction restrictions for the project implementation

Expert Group has launched mass production of an automatic component installer for PCBs with support for domestic and Western standards

Russian manufacturer expands its product line for aviation and UAVs after approval from the Ministry of Industry and Trade

UV spectrometry-based technology will improve copper production efficiency and reduce raw material losses

Russian auto giants assessed the production capacity of Zaporozhye and prepared orders for components for trucks and cars

24 units successfully tested in the Moscow Metro

The capacity of the new line will be 250,000 tons annually

Work is scheduled to be completed by June 12, 2026