
Kalashnikov decided to streamline tool management at five plants at once
The system, launched in 2024, has reached new sites and will receive an AI assistant in the future

The system, launched in 2024, has reached new sites and will receive an AI assistant in the future

Expert Kirichenko: Russian technologies have confirmed their reliability and safety

Reinforced cast iron block and four-valve heads are designed for high loads

The enterprise faced a claim from a psychiatric hospital for employee medical examinations

IDRW: Russian Federation seeks large order to load production

The plant was built with the help of Soviet specialists in 1968

The creditor demands to recover the debt and appoint an interim manager

A St. Petersburg engineer invented a design that combines spiral channels, electric start-up, and turbine blades

The new development made of aluminum, cobalt, chromium, nickel, and niobium proved to be 2.6 times more effective than aviation analogues

Power units with RITM-200M reactors will provide a total capacity of 200 MW and will supply electricity to the north of Halmahera Island

Microcontroller synchronization works with microsecond precision

TSTU expert Melnikov: deepening by 50 meters increases construction cost by 3 times

Designer Shchuchkin calculated that the power unit would have higher efficiency

The enterprise restructured the process to ensure tools are not delayed

The company has fulfilled some overdue deliveries, but postponements of power plant construction are reducing the prospective order portfolio