GTLK

The legendary "Moskva" is back - the electric river tram of the future is ready
The new vessel is designed for 140 passengers and can operate for up to 8 hours without recharging

"Ak Bars" is ready to produce a record eight "Meteors" per year: the main problem of the industry is named
The manufacturer announced its intention to increase the construction of high-speed vessels if the market receives clear and regular orders

Buyers of 40 Il-114-300 turboprop aircraft with low-mounted engines named
GTLK is developing a financial model for aircraft deliveries

SJ-100 Delivery Dates Shift Right: GTLK Expects to Receive Liner Only in 2027
The company is only participating in the second phase of aircraft delivery

GTLK prepares contract for Tu-214 for S7 with unusual cockpit configuration
The first ten aircraft will have a separate flight engineer's seat, while the rest will be in a standard two-pilot configuration

A huge batch of LMS-901 "Baikal" to be delivered to a new customer
GTLC: "Aerokhimflot" to receive "Baikal" aircraft in 2027

Rostec to Supply 6 New Mi-8MTV-1s to Russian Regions by the End of 2026
The helicopter's universal platform is designed for all climatic zones

MC-21, Il-114-300, and SJ-100 supply operator went into the red by 6 billion rubles
GTLK's assets increased to 1.3 trillion rubles

New VOLGABUS 429804 buses will enter routes in the Moscow Region
GTLK delivered 9 buses to AO "Mostransavto"

First Heavy VTOL Drones TFM-15-8E Delivered Under State BAS Leasing Program
The drone is an aircraft-type with vertical take-off and landing

Nefteflot completed the installation of auxiliary diesel generators on Project 04790 "Sommers-L" passenger catamarans
At the same time, the diesel-reduction gear units on the vessels were inspected

Role of GTLK in Tu-214 Supply Project for S7 Outlined
The company will provide favorable terms and attract government funding

Tu-214 catches up with the Airbus A321 and Boeing 757-200 after 30 years
S7 signed a memorandum for the delivery of 100 airliners in a cabin configuration without a flight engineer

Ships Become More Expensive Due to Import Substitution: Plans to Supply Russian RSD59 Project Dry Cargo Ships Cut Almost in Half
The shipbuilding industry is facing a shortage of qualified personnel
