SJ-100 has completed the certification testing phases in Syktyvkar and returned to Zhukovsky. The crew of the aircraft with tail number 97003 conducted an assessment of aerodynamic adjustments for air pressure receivers in flight. The work was carried out at various altitudes in accordance with the additional certification testing program.
In parallel with the main tasks, specialists checked the reliability and efficiency of key aircraft systems. The data obtained will allow refining the characteristics of the aircraft and bringing it closer to obtaining a full type certificate.
As noted in the aviation industry, such tests play a critical role in ensuring safety and compliance with international standards.
As a reminder, on February 17, the MC-21 and SJ-100 aircraft flew to Syktyvkar, where specialists studied the operation of systems and equipment in harsh northern conditions.
Read more materials on the topic:
Now on home
Anatoly Matviychuk: Bombers complement the nuclear triad and operate remotely
The Ministry of Defense was pleased with the work of high-payload UAVs
The Deputy Prime Minister of the Russian Federation emphasized the priority of the turboprop airliner's reliability over delivery times
Combat vehicle shot down 25 drones in a single sortie
Technology has been successfully tested
The project will be implemented at the plant in Nizhny Novgorod, where Skoda and Volkswagen were previously produced
Business Insider: New missiles have turned the aircraft into a dangerous adversary
The crew conducted aerodynamic and air pressure receiver tests at altitude
Starting price of the station at auction is 4 billion rubles
Mass production is scheduled to start this year at the gigafactory in Krasnaya Pakhra
No contractor was found for the development of the project for 2.37 billion rubles