A new Air Traffic Control Tower (ATC) was commissioned at Grozny (Severny) Airport as part of the "Transport of Russia" forum. The opening ceremony was conducted remotely by Prime Minister Mikhail Mishustin and Minister of Transport Andrei Nikitin. The head of Rosaviatsiya, Dmitry Yadrov, also participated in the event.
The ATC complex includes two key elements:
- A two-story administrative building, the silhouette of which repeats the shape of a crescent;
- A 52-meter control tower with 10 floors, made in the form of a hyperboloid.
The object was designed by the "Aeroproject" Institute, which is subordinate to Rosaviatsiya. The construction was financed by the State Air Traffic Management Corporation (OrVD).
The new ATC is designed to improve the efficiency of air traffic management and improve the infrastructure of Grozny Airport.
Read more materials:
Now on home
Start of deliveries scheduled for 2027
Over 51,000 new motorcycles were sold in Russia in 2025
The car will take at least a year to assemble
The application's audience has reached 20 million users
The model will be included in the list of cars for taxis, price - from 2.25 million rubles
All parking lots of the "Administrator of the Moscow Parking Space" are connected to the service
The cars will be supplied to the Moscow Transport Service Directorate
Deliveries to India may begin in 2028
The technology provides automated search for all types of defects in power units
The plane flew 500 km, accelerating to 425 km/h
The plant stated that the information about the termination of purchases for models 6 and 8 is not true
Scientists are using the "Ekran-M" installation