KAMAZ is on the home stretch of the project for full localization of the production of cabs for fifth-generation trucks (K5). After the completion of the modernization, the plant will be able to produce more than 30 thousand vehicles per year, the company's press service reported.
Key areas have been updated at the Press and Frame Plant (PRF) - stamping, welding, and metal preparation shops. A new welding machine and a robotic complex have been put into operation, ensuring impeccable quality of 17 welded joints of the cab frame.
A modern automatic metal cutting line, transferred to program control, has been installed in the preparation shop. It triples productivity and guarantees the absence of surface defects. To improve the safety of the working area, the line is equipped with sensors that completely eliminate injuries.
By the end of the year, it is planned to launch three laser installations for cutting parts and a new longitudinal cutting line, which will double productivity and remove restrictions on the width of blanks.
"The K5 cab localization project is being implemented strictly on schedule. The new equipment will allow us to produce products of the highest quality and ensure a powerful start next year", the company noted.
KAMAZ K5 is a key area for updating the model range of the auto giant, focused on increasing localization and technological independence of the Russian automotive industry.
Read more materials on the topic:
Now on home
Start of deliveries scheduled for 2027
Over 51,000 new motorcycles were sold in Russia in 2025
The car will take at least a year to assemble
The application's audience has reached 20 million users
The model will be included in the list of cars for taxis, price - from 2.25 million rubles
All parking lots of the "Administrator of the Moscow Parking Space" are connected to the service
The cars will be supplied to the Moscow Transport Service Directorate
Deliveries to India may begin in 2028
The technology provides automated search for all types of defects in power units
The plane flew 500 km, accelerating to 425 km/h
The plant stated that the information about the termination of purchases for models 6 and 8 is not true
Scientists are using the "Ekran-M" installation