Construction of a large-scale federal-level science and technology center "Composite Valley" dedicated to the development and production of composite materials has started in the Tula Region.
The project is being implemented within the framework of the national project "New Materials and Chemistry" and is positioned as a driver of technological development in Tula and the entire region.
Demolition and preparatory work has begun on a land plot of 10 thousand square meters. The total area of the complex will be 34 thousand square meters, which will house research laboratories, testing grounds and educational spaces. Previously, the Russian government allocated 1 billion rubles for equipping the center, which will allow the development, modeling and production of composites in small volumes for scientific and industrial needs.
Governor of the Tula Region Dmitry Milyaev emphasized that the creation of the center will bring the region to leading positions in the field of composite technologies and will become a platform for uniting science, education and industry. "The project creates an innovative ecosystem for the development and implementation of new materials and the training of highly qualified personnel," he noted.
Experts believe that the "Composite Valley" will accumulate advanced scientific developments, accelerate the introduction of new materials into industry and create conditions for sustainable economic growth in the region. In addition, the project strengthens the position of the Tula Region as one of the industrial leaders of Russia.
Read also on the topic:
The new "Composite Valley" in Tula will receive a billion rubles from the state
Will protect rockets at temperatures above 2300°C: MAI is developing a unique material
Now on home
The reason for indexation may be inflation, an increase in VAT, and rising production costs
The Ministry of Industry and Trade believes that the increase in the levy will not affect responsible manufacturers
The crew accelerated the aircraft to 580 km/h instead of the cruising speed of 450 km/h
Ship equipment comes to Russia from China at inflated prices
Almaz-Antey and the Belarusian Ministry of Defense signed a contract for equipment maintenance
The complex's computing resources allow for the competent distribution of targets between launchers
Among the spacecraft are Aist-2T No. 1 and No. 2
Deputy Prime Minister Novak announced a postponement of the deadlines, but confirmed the commitment to developing the sector
Design engineers without experience are promised salaries from 80 thousand rubles
Hard and dense shot ensures the destruction of the target from the first hit, regardless of the drone's body material
Almost all body elements are zinc-treated
SOGAZ lost the case in court against UEC-UMPO