The Sokol aircraft plant in Nizhny Novgorod has expanded the production of components for the Il-114-300 turboprop and MC-21-310 passenger aircraft. The company will open 12 new sections for the production of units.
These measures will increase aircraft production and improve the quality of manufacturing of keel beam compartments, fuselage compartments and door parts.
To improve the quality and efficiency of production, the plant is creating a Center of Competence for foundry production with modern equipment, including 3D printers for additive manufacturing, melting furnaces and heat treatment plants.
Certification of the Il-114-300 is scheduled for December 2025, and the transfer of the first production vehicles to customers will begin in the spring of 2026.
Earlier www1.ru reported that the SJ-100 jet made more than 10 approaches with a go-around near.
Read also:
Now on home
Moscow sent 43 containers of weapons, including ATGMs and sniper rifles
There is a need to increase air traffic within Russia and abroad
Lada Niva Travel with a new 1.8-liter engine tested at temperatures of -25 and -30 °C
Производить первую энергию планировали ещё в апреле 2025 года
Retail is in second place, and education and medicine are in third place
The basic version of the system is capable of hitting targets at a range of up to 300 km
Security forces challenged the legality of yachting entertainment
JBI shelters built for aircraft
Attackers offer to participate in a gift drawing
The new VPR machine services 3300 sleepers per hour and requires only three operators
The drones have been re-flashed and have shown reliability in testing
The Christmas ball weighs 17 carats, and the puppy-shaped diamond weighs 2.7 carats