ODK Engineering (part of the United Engine Corporation) will supply a GPA-25 gas pumping unit to the Chayandinskoye field, where gas is extracted for transportation via the Power of Siberia main gas pipeline.
The fully domestic unit uses a PS-90GP-25 gas turbine engine manufactured by UEC-Perm Engines (part of UEC) as a drive.
The engine is reliable, highly efficient and provides economical operation at maximum performance. The unit is equipped with a remote control system with a high degree of protection.
12 gas pumping and power units of our production are already operating at the Chayandinskoye field. The commissioning of the new unit will bring the total capacity of UEC equipment at this field to 205 MW.
Read more materials:
Platform for flexible automation presented at KMZ
KMZ will equip gas carriers with cryogenic valves
KMZ has modernized nutrunners for the reactor and steam generator for the Kursk NPP-2 project
Now on home
Start of deliveries scheduled for 2027
Over 51,000 new motorcycles were sold in Russia in 2025
The car will take at least a year to assemble
The application's audience has reached 20 million users
The model will be included in the list of cars for taxis, price - from 2.25 million rubles
All parking lots of the "Administrator of the Moscow Parking Space" are connected to the service
The cars will be supplied to the Moscow Transport Service Directorate
Deliveries to India may begin in 2028
The technology provides automated search for all types of defects in power units
The plane flew 500 km, accelerating to 425 km/h
The plant stated that the information about the termination of purchases for models 6 and 8 is not true
Scientists are using the "Ekran-M" installation