PJSC "Yakovlev" (part of the United Aircraft Corporation of the Rostec State Corporation) is actively working on three prototypes of the latest Yak-130M combat trainer aircraft. The date of the first flight will be known after the completion of the manufacture of the first prototype and ground testing of the aircraft.
The company noted that the capacity of the Irkutsk Aviation Plant is sufficient to manufacture new Yak-130Ms. In terms of design, the new aircraft is identical to the Yak-130.
The prototypes of the containers of the "President-S" onboard defense system are being manufactured for installation on the Yak-130M aircraft and preliminary tests.
BKO "President-S130" is an adaptation in a container version of a serial defense complex - an optoelectronic system for protecting aircraft and helicopters "President-S".
The system is designed for individual protection of the Yak-130M aircraft from being hit by anti-aircraft missiles, aviation missile systems, including portable anti-aircraft artillery systems, by detecting the fact of threats and countering attacking weapons.
The Yak-130M is capable of carrying a combat load of up to 2,500 kg and is designed for a maximum take-off weight of 10,290 kg.
The updated aircraft is equipped with two AI-222-25 turbofan engines, each of which develops a maximum thrust of 2500 kgf and improves the aircraft's flight characteristics. In addition, engineers installed four more containers to carry up to 16 bombs weighing 100 kg.
Earlier www1.ru reported that Rosoboronexport presented the improved BMP-3, taking into account the requirements of modern combat.
Read more materials:
The first footage of the combat use of the latest Uragan-1M MLRS has appeared
The "Caliber" carrier submarine "Magadan" made a deep-sea dive off the coast of Kamchatka
The exact characteristics of the revolutionary kamikaze drone detector "Ten" have been revealed
Now on home
Netizens believe that UAVs are better replaced by thousands of small satellites at an altitude of 200 km
Likhachev: We are ready to offer Serbia the entire range of our projects
Fraudsters have learned to imitate the interface of a bank and payment system
The truck can operate as part of road trains weighing up to 100 tons
Work on the high-speed maglev body has already begun
The first stages of the program are planned to be completed by 2032
Recovery teams are working at the scene
The fifth prototype was accelerated to 190 km/h at an altitude of 300 meters
Over the past two years, the growth rate in this segment has been at 15%
Experts got acquainted with the key objects of the experimental base and advanced methods of certification flights
In annual reports, parliamentarians willingly share statistics from their channels
The university is also working on creating robotic manipulators and robotic welders